Back to Blog
Announcement

Introducing Board View — a Kanban That Knows Your Schedule

Ganty Team

Ganty now has a Board View. Alongside the timeline (Gantt chart), you can see the same tasks as a status board, and switch between the two anytime from the toolbar.

Ganty's board view with Not started, In progress, Done, and On hold columns, showing task cards with due dates and progress
Board view — drag cards to change status, with due dates and overdue work at a glance.

What you can do

  • Four status columns: Not started / In progress / Done / On hold — your tasks as an at-a-glance board.
  • Drag to change status: move a card between columns. Drop it in "Done" and progress snaps to 100%; "Not started" sets it back to 0%.
  • Due dates and overdue at a glance: every card shows its due date, and unfinished past-due tasks turn red.
  • Click for details: click a card to open its task panel.

Why add a board to a Gantt tool

A Gantt chart is for planning — you open it now and then to see the whole picture. A board is for doing — the daily surface where you move "what's next." Having both over the same tasks connects the plan to the daily work.

But Ganty's board differs from a typical Kanban in one way: it knows your schedule. Cards carry due dates, and late ones go red. A generic board has no "by when"; Ganty's board shares the Gantt's tasks, so it stays tied to your deadlines.

A design choice: the board never breaks your dates

Moving a card on the board does not change task dates. Only the status changes (plus progress for Done/Not started). The scheduling math — critical path, and dependency-aware bulk rescheduling — still runs exactly on the server, on the Gantt side. So you never get "the AI or a teammate moved the board and the schedule broke" (the same principle we cover in why AI-generated schedules drift).

How to use it

Open a project and pick "Board" from the view switch on the left of the toolbar; switch back to the timeline anytime. Haven't tried Ganty yet? The no-signup demo lets you play with the board, the Gantt, AI generation, and MCP — all free on every plan.

Takeaway

With Board View, Ganty lets you move between planning (Gantt) and doing (board) over the same tasks — the ease of a Kanban with a Gantt's sense of time. For choosing between them, see Gantt vs Kanban vs Scrum.

Related Articles